The Sums don’t have to make sense, but they do need to add up….

Well the next build slot is Feb-April 2010. We’re sweating on holding on the deposit to secure it until we get confirmation of the loan from the bank – a few weeks off yet. OEC report that there is some customer competition too, with someone waiting for a property sale to go through to fundContinue reading “The Sums don’t have to make sense, but they do need to add up….”

Build Update – It’s getting there!

On 5th October Anton wrote “The vehicle ramp was delivered to the engineering firm beginning of last week. Most of the parts have been drawn up ready for the water cutter. We have phoned them this morning for an update and will keep pestering them for final prices / timings. Paul and I have lookedContinue reading “Build Update – It’s getting there!”

Taking Delivery of the Azalai

Well it’s got there – just about. Today we went over to OEC to collect the Azalai from OEC. We arrived late in the afternoon and found the guys hosing her down (luckily for Alicja who otherwise might have found that she was carwashing it at her fundraiser tomorrow!) The tail-lift is still being fabricatedContinue reading “Taking Delivery of the Azalai”

Dual Tank fueling issues

We were staying with friends at the excellent Bickleigh Farm (great Birthday Party Adele – thank you) – with the intention of sleeping in the van. The first night was fine despite the outside temperature dipping below zero. However in the morning we tried to boil some water for a cup of tea which causesContinue reading “Dual Tank fueling issues”

Getting tight on the build

We’re still waiting for the tail-lift, but I’ve been over to OEC to see it progressing. Paul is waiting for some solenoids to arrive to operate locking-pins to secure the lift in it’s various positions (to take the strain off the hydraulics when the lift is stationary). Even on it’s work-stand it looks a workContinue reading “Getting tight on the build”

Finishing touches

Dropped the Azalai off at OEC today to get the finishing touches completed. Everyone is optimistic we’ll get there before Christmas, but the manufacturers of the solenoids (to operate the tail-lift locking-pins) have consistently reneged on promised delivery dates over the last few weeks. Anyway, regardless everything else can happen: Uprated headlamp bulbs (the Defender’sContinue reading “Finishing touches”